Stormwater Current Projects

Contact Information


The following list is a list of current projects that the Stormwater Department is working on. New projects will be added as they are needed.

To view pictures of completed projects click on the project address.  

CURRENT STORMWATER PROJECTS 

Address Issue Status
218 South Palmers
Chapel Road
Install catch basin within right-of-way Ongoing
118 Oakdale Drive Re-establish swale, clean culvert crossing
222 Oakdale Drive Re-establish swale, culvert repair
108 Sycamore Drive Re-establish ditch line and clear debris
allowing positive flow
110 Breechbrook Drainage improvements by installing a
new pipe between 108 and 110
Beeckbrook Court
200 Convington Bend Small job needs done at headwall side
of house - clean, filter fabric, rip-rap as
needed
216 Shady Lane Re-establish ditch line and clear debris
allowing positive flow
160 Blueberry  Debris needs to be cleared from
drainage ditch allowing positive flow
312 Walnut Court Re-establish ditch line and clear debris
allowing positive flow
400 Covington Bend Re-establish ditch line to allow positive
flow of storm water
216 Cherry Lane Re-establish ditch line to allow positive
flow of storm water
204 Beeckbrook Court Debris needs to be cleared from
drainage ditch allowing positive flow
212 Lone Oak Drive Re-establish ditch line to allow positive
flow of storm water
506 Foster Drive Create drainage swales and cut curb
on both sides to all water to flow off
street to ease driveway flooding
303 Hillwood Drive Install rip rap to alleviate washout
of stone wall
109 Meadows Court Re-establish ditch line and clear
debris allowing positive flow
Hickerson Drive
(both sides)
Clean out ditch line to evaluate
necessary reparis/remove trees from
ditch line
125 Village Court 1. Clean inlet channel area back
50-100' 2. Work from west side of
stream 3. Use rip-rap as needed on both
sides of the box culvert 4. Use spoils to
fill in ditch line
109-111 Shady Lane Rehab ditch, create swale, add topsoil,
seed and straw
203 Allers Drive Cleaning out driveway culvert
100 Oak Park Court Install drainage pipe along the Meadows
Road side and fill in the ditch
309 Covington Bend Re-establish swale, repair/cleanout culvert
416 Highway 76 Re-establish swale, clean culvert
125 Brooklawn Drive Re-establish swale
121 Industrial Drive Re-establish swale, clean culvert
205 Hobbs Drive Re-establish swale, construct drainage basin
301  Rolling Acres Drive Re-establish swale, replace culvert
401 Hobbs Drive Re-establish swale
100 Hobbs Drive Re-establish swale
103 Spicer Court Re-establish swale, remove rip rap
209 Rolling Acres Drive Re-establish swale
214 Robert Avenue Clean culvert
215 Rolling Acres Stormwater swale rehabilitation
3431 Pleasant Grove Road Re-establish swale
128 Larkspur Court Clean culvert
218 Eastside Drive Replace culvert to allow positive flow
210 Spring Street Re-establish swale to Valley View Drive
128 Covington Bend Re-establish stone within swale
199 Rachel Court Re-establish swale
100 Heritage Drive Re-establish swale/extend wing wall
105 Winchester Court Rehabilitate drainage infrastructure to
provide positive flow
176 Blueberry Clean catch basin and re-establish swale
164 Honeysuckle Drive Re-establish swale/clean culvert
210 Beechbrook Court Re-establish swale to provide positive flow
102 Rolling Forrest Court Clean culvert and establish swale to provide
positive flow
308 Holly Lane Repair drainage structure
212 Donal Terrace Clean culvert and re-establish swale to provide
positive flow
404 Sunnybrook Drive Clean culvert and re-establish swale to provide
positive flow
112 Kristen Court Holes around pipe that runs from the street back
to the creek
403 Autumn Wood Drive Rehab drainage
406 Hunterwood Drive Re-establish rip-rap ditchline from headwall to
rear of property
100 Meadow Court Install pipe from Church to Wilkinson to Meadow
Court and install sidewalk
307 Amber Lane Rehab the ditch between 307 & 308 so that the water
flows into headwall and drainage system
100 Baylee Court Upgrade piping to allow positive flow; remove and
replace existing pipe
212 Morgan Trace Court Remove overgrown vegetation surrounding culvert;
establish swale behind property. Seed and straw
eroded areas at residence
122 Sycamore Drive Re-establish swale and remove vegetation and
sediment within headwall; remove debris from
catch basin at intersection of sycamore and honeysuckle

  

COMPLETED STORMWATER PROJECTS

Address Issue Status
304 Covington Bend Replace drainage system as needed  Completed 09/11/2017
Dee Cee Road/S.C.T. Drive Install a new drainage system and widening the intersection for tractor trailer traffic.  Completed 08/15/2017
Hester Drive KFC to Hampton Inn - To Install sidewalk and drainage, where required, also sidewalks on Knights Circle to the Holiday Inn  Completed 11/23/2016
113 Eastside Drive Re-establish ditch line and clear debris allowing positive flow.  Completed 01/14/2016
115 Brooklawn Drive

Install culvert in ditch in front of house - new head wall to tie into existing headwall.

Need to rehab South side drainage ditches-via swales installation-from 31W to creek

 Completed 09/09/2016

103 Cardinal Drive

Drainage improvements on the north side of Cardinal using pipe and catch basins as needed, creating a new crossing at a 90 degree angle, removing rip rap from south side and swale and seed

 Completed 10/11/2016

503 Laura Drive

Re-establish ditch line on both sides, install new drainage culverts, 

Completed 12/14/2016

225 Peachtree Street

Repaired soil erosion near catch basin

Completed 10/10/2016

200 South Aztec Drive

Repaired soil erosion/extended end wall

Completed 10/10/2016

Kristen & Donal Terrace

Re-establish ditch line and clear debris allowing positive flow

Completed 11/17/2016

301 Rachel Court

Repair culvert failure within right-of-way

Completed 02/13/2017

106 Pebble Creek Court

Clean catch basin and re-establish ditch line

Completed 02/01/2017

409 Brinkley Lane

Extend culvert and repair undermining of roadway

Completed 08/29/2017

759 McCurdy Road

Drainage swale improvement/restoration project

Completed 09/07/2017

Carmack/Whitson Court

 Repair damaged head walls/re-establish ditch line

Completed 09/21/2017

Sage Road Sidewalk Project

Drainage/sidewalk installation project

Completed 05/21/2018

110 Tison Lane

Stormwater restoration work at culvert crossing

 Completed 07/16/2018

112 Tison Lane

Stormwater restoration work at culvert crossing

 Completed 07/16/2018

Oakdale Drive

Re-establish swales to detention pond

 Completed 09/04/2018

408 Hunterwood Drive

Re-establish drainage swale as needed - partially blocked by rocks that have moved down stream over time and the water never fully drains.

 Completed 08/15/2018

802 Calista Road

Establish a ditch line from the city installed headwall, between the houses and to the rear of the property

 Completed 05/23/2018

207 Volunteer Drive Re-establish ditch line and clear debris allowing positive flow  Completed 06/28/2018
401 Rolling Acres Debris needs to be cleared from drainage ditch allowing positive flow  Completed 01/30/2019
177 Blueberry Repaired soil erosion near headwall  Completed 11/09/2016
306 Donal Terrace Re-establish ditch line and clear debris allowing positive flow  Completed 09/27/2017
900 Wilkinson Lane Reset of culvert making it lower; allowing positive flow of storm water  Completed 10/22/2018
423 Wilkinson Lane Re-establish ditch line to allow positive flow of storm water  Completed 10/22/2018
N. Palmers Chapel Rd at
Chapman Drive
Replace culvert.  Completed 09/27/2018
609 Wilkinson Lane Re-establish ditch line and clear debris allowing positive flow  Completed 10/22/2018
Oak Place at Shady Ln

Replace culvert.

 Completed 11/19/2018

Intersection of Oak Place and Shady Lane

Replace culvert crossing on Oak Place

 Competed 11/19/2018

426 Barksdale Drive

Reestablish drainage swale along Barksdale Drive from Mason Court to Cheyenne

 Completed 05/30/2018

106 Hunterwood Court

Swale from street catch basin to rear of property between the two houses needs to be re-established to allow positive flow.

 Completed 08/15/2018

302 Autumnwood Drive

Rip-rap small section of bank at the curve

 Completed 02/05/2018

106 Forrest Lane

Re-establish swale

 Completed 10/19/2016

Wilkinson Lane & Edenway Drive

Re-establish swale, clean culvert

 Completed 01/02/2019

Wilkinson Lane & Mt. Vernon Court

Re-establish swale/shoulder

 Completed 01/02/2019

701 Stoval Drive

Re-establish swale, clean culvert

 Completed 01/02/2019

105 Cider Mill

Adding catch basin and culvert pipe between the houses for a length of about 100 feet

 Completed 03/21/2019

213 Louise Drive

Clear debris from ending of concrete swale

 Completed 02/25/2019

110 Highland Drive

Re-establish swale to Cranor Drive/clean culverts

 Completed 01/30/2019

415 Wilkinson Lane

Re-establish swale

 Completed 01/24/2019

North Palmers Chapel Road @ South Palmers Chapel Road

Re-establish swale/clean culvert

 Completed 10/25/2018

105 Highland Drive

Clean culvert and establish swale to provide positive flow

 Completed 01/30/2019

511 Wilkinson Lane

Clean culvert and establish swale to provide positive flow

 Completed 01/24/2019

609 Wilkinson Lane

Clean culvert and establish swale to provide positive flow

 Completed 01/24/2019

102 Indian Point Drive

Clean culvert and re-establish swale to provide positive flow

 Completed 01/02/2019

223 Oak Place

Replace culvert

 Completed 11/19/2018